Dr.Vakuum
Все применения

HVAC and refrigeration: system evacuation and dehydration before charging

7 мин чтения

Thailand is one of the world's largest producers of air conditioners and refrigeration compressors, and one of the largest consumers of them. Every unit, from a window air conditioner on a production line in Rayong to a 2,000-ton chiller in a Bangkok tower, is evacuated before it is charged with refrigerant: the air and, far more importantly, the water vapour inside the circuit are pumped out until the pressure is a fraction of a millibar. Skip or shorten this step and the system's life is measured in months. It is a vacuum duty every HVAC technician knows and almost every one under-equips.

1. Why moisture, and why 500 microns

A refrigeration circuit is a closed loop of compressor, condenser, expansion device and evaporator with refrigerant and oil inside. Water in it does three things:

  • Freezes at the expansion valve, where the refrigerant flashes to −20 °C or lower, blocking the flow intermittently.
  • Hydrolyses the refrigerant and the oil: HFC refrigerants and water form hydrofluoric and hydrochloric acids at compressor temperatures, and POE (polyol ester) oils — standard with modern refrigerants — hydrolyse back to acids and alcohols. The acids attack the motor windings and copper-plate the bearings.
  • Forms sludge with the oil breakdown products that blocks the filter-drier and the capillaries.

Air (non-condensables) adds a fourth: it collects in the condenser, raises the head pressure and the power, and carries oxygen that accelerates the oil's oxidation.

The industry target is 500 microns (500 µmHg = 0.67 mbar) for systems with POE oil, and a rise test: isolate the pump and the pressure must not climb above 1,000 microns in 10–15 minutes (a rise to a plateau means moisture still boiling off; a steady rise means a leak). The target is a pressure, not a time, because the water's vapour pressure at the pipe temperature is what the pump is working against: at 25 °C, water boils at 31 mbar, and the pump has to pull the system two decades below that before the last adsorbed water on the copper walls leaves at a useful rate.

Why does a single-stage pump take all day and a two-stage pump an hour?

Because 0.67 mbar is right at a single-stage oil-sealed pump's ultimate (0.5 mbar), where its speed has fallen to almost nothing — and the water load during evacuation is a continuous gas load that holds the system pressure at Q/S. A single-stage pump sits at 1–2 mbar with the ballast open and never reaches the target. A two-stage oil-sealed rotary vane pump with a 5 × 10⁻³ mbar ultimate (closed ballast) and 4 × 10⁻² mbar (open) is two decades below the target, keeps most of its speed at 0.67 mbar, and pulls the water off the walls at a rate set by the water's desorption, not the pump's limit. Every refrigeration evacuation pump worth the name is two-stage; the DV Series is the industrial version of the technician's kit pump.

2. Field evacuation of large systems

A 1,000-ton water-cooled chiller or a supermarket's refrigeration rack has a circuit volume of 500–3,000 L and hundreds of metres of pipe, much of it brazed on site with moisture in it. The evacuation procedure:

  1. Triple evacuation: pull to 1,500 microns, break with dry nitrogen to slightly above atmosphere, pull again, break again, pull to 500 microns. The nitrogen sweeps carry out moisture that a single deep pull would leave adsorbed.
  2. Large hoses and core-removal tools: the pump's speed is wasted through a 6 mm charging hose — a 20 m³/h pump through two 1.5 m charging hoses has an effective speed of perhaps 3 m³/h; through 10 mm hoses with the Schrader cores removed, 12–15. Conductance is the whole game on a long system.
  3. Pump sizing: the rule in the trade is 1 m³/h per 100 L of system for a small split; for large systems the volume matters less than the moisture and the hose conductance. A DV60 (60 m³/h) connected through 20 mm lines at both the high and low sides evacuates a 2,000 L chiller circuit to 500 microns in 2–4 hours, where a 10 m³/h kit pump through charging hoses takes two days and may never get there in a humid plant room.
  4. Gas ballast open during the first stages (the pump is inhaling water vapour), closed for the final pull to reach the ultimate.
  5. Rise test, then charge.

For a new building's chilled-water or VRF system with several circuits, contractors bring a DV90 or DV175 on a trolley and evacuate circuits in parallel through a manifold.

3. Factory charging lines

An air-conditioner or refrigerator factory evacuates every unit on the line before charging — at 40–120 units per hour per line, with a circuit volume of 1–5 L per unit and a target of 100–200 microns (factories go lower than the field because the circuit is dry from the start and the cycle is short). The evacuation station has a vacuum manifold with several ports, a two-stage pump per 2–4 ports, and a cycle of 2–6 minutes per unit including the rise test.

Sizing: a 3 L circuit to 0.2 mbar through a 10 mm quick-coupler and 1 m of hose in 90 seconds. The volume is trivial; the duty is the moisture desorbing from the brazed copper and the conductance of the coupler (perhaps 5 m³/h at 1 mbar). A DV16 (14 m³/h) per two ports, or a DV30 (30 m³/h) per four, with the pumps in a plant room and the manifold at the line. A line of 90 units/h with a 4-minute cycle has six ports open at once → 2 × DV30 + a standby. The pumps run continuously, with gas ballast open, and their oil is changed on hours because the process is a steady diet of water vapour.

A helium leak test often precedes the evacuation on the same line (the unit is evacuated, charged with helium, and sniffed or chamber-tested) — the same pumps and the arithmetic of the leak testing note.

4. What reaches the pump

  • Water vapour — the whole point; gas ballast and warm pump handle it; oil changes by condition.
  • Refrigerant — a system being evacuated after a repair still holds refrigerant dissolved in its oil, which comes off under vacuum. Refrigerant in the pump oil raises its vapour pressure and spoils the ultimate; recover the charge first, then evacuate. HFO and HFC refrigerants are not acutely harmful to the pump; ammonia (industrial refrigeration) needs a pump with ammonia-compatible oil and seals, or a liquid ring unit.
  • POE and mineral oil mist — from the compressor; a trap flask on the inlet.
  • Brazing flux and copper oxide — a filter on the factory manifold.

The pump's exhaust carries water vapour and traces of refrigerant; duct it outside the plant room. An oil mist separator with a drain so the condensed water does not run back into the pump.

5. Beyond vacuum pumps: the rest of the HVAC plant room

Vacuum appears elsewhere in an HVAC plant room, in smaller roles:

  • Chiller purge units on low-pressure (centrifugal) chillers: a small refrigerated purge draws non-condensables from the condenser and vents them, its vacuum pump a DV5 or DV16.
  • Chilled-water system vacuum degassing: a side-stream degasser that pulls dissolved air out of the chilled water loop under vacuum (10–20 % of the air in a closed loop causes corrosion and pump cavitation) — a small liquid ring or dry vane pump, DRV10.
  • Vacuum insulation panel manufacture for cold rooms and refrigerators — a deep (10⁻² mbar) chamber duty, DV90 with a booster.

6. Worked duties

Duty Circuit Target Dr.Vakuum answer
Residential split service (reference) 3–10 L 500 microns Technician's two-stage kit pump, 5–10 m³/h
VRF building, 8 circuits of 200 L 1,600 L total 500 microns DV60 with manifold, 20 mm lines
1,000-ton chiller commissioning 2,500 L 500 microns, rise test DV90, core-removal tools, triple evacuation
Supermarket CO₂ rack 800 L, high-pressure 300 microns DV60
AC factory line, 90 units/h 3 L each, 6 ports open 200 microns in 90 s 2 × DV30 + standby, manifold, N₂ break
Refrigerator factory, 120 units/h 1 L each 100 microns 3 × DV16
Industrial ammonia plant, 5,000 L 5,000 L 1 mbar V140 with ammonia-grade oil, or LM200-065 liquid ring

Recommended Dr.Vakuum machines

Two-stage oil-sealed rotary vane (DV Series) — every evacuation duty to 500 microns or below: DV5 (5.4 m³/h), DV16 (14 m³/h), DV30 (30 m³/h), DV60 (60 m³/h), DV90 (90 m³/h), DV175 (160 m³/h).

Single-stage (V Series) and liquid ring (LM Series) — ammonia and large industrial refrigeration at 1 mbar targets: V140, LM200-065.

The physics of why the last decade is slow — and why a pump that is "pulling vacuum" may be doing nothing — is in How to size a vacuum pump; what moisture does inside the pump itself is in Gas ballast, water vapour tolerance and why pumps drown.

System to pump. Tell us the circuit volume, the refrigerant and oil, the target microns and — for a factory — the units per hour and ports, and we will size the pump and the manifold. Talk to an engineer.