Power plant condenser air extraction: the vacuum that sets the turbine's output
Thailand's power system has hundreds of steam turbines — in the gas combined-cycle plants that carry the grid, in biomass and bagasse cogeneration at sugar mills, in waste-to-energy and industrial cogeneration. Every one exhausts its steam into a condenser held at 40–100 mbar absolute, and every one has an air-extraction system — a vacuum pump or ejector set — whose only job is to remove the air that leaks into that condenser. It is a small machine on a large plant, and it has a direct line to the plant's revenue: let the condenser pressure rise 10 mbar and a 100 MW unit loses roughly 1–1.5 MW.
1. How a condenser makes vacuum, and what the pump does
The turbine's exhaust steam flows over thousands of tubes carrying cooling water; it condenses; its volume collapses by a factor of 20,000; the pressure in the shell falls to the saturation pressure at the condensate temperature — 42 mbar at 30 °C, 74 mbar at 40 °C. The cooling water sets the achievable pressure, and the Thai climate sets the cooling water: 30–33 °C from a cooling tower in the hot season, which is why Thai units run at 80–100 mbar when a European unit on 15 °C river water runs at 30–40.
The pump does not make the vacuum. It removes non-condensable gas — air leaking in through the turbine gland seals, the condenser's expansion joints, valve stems, flanges and instrument tappings in everything below atmospheric pressure, plus the dissolved gases released from the make-up water. If that air is not removed it accumulates at the coldest, lowest-pressure part of the tube bundle (the air-cooler section), blankets the tubes, stops them condensing and raises the back-pressure. The air-extraction system holds the air at the air-cooler outlet at a partial pressure low enough that the condenser performs — and that outlet is where the pump's suction connects.
Why is the pump sized by the leak and not by the steam?
Because the steam is condensed before it reaches the pump; what the pump sees is the leak air saturated with vapour at the air-cooler outlet temperature. The Heat Exchange Institute (HEI) standards give the design air in-leakage as a function of the turbine exhaust flow: for a unit exhausting 100–250 t/h of steam, the design air load is about 9–14 kg/h (scfm figures of 12.5–17.5 in the standard), plus a margin for plant age. The vapour that comes with it is set by the air-cooler outlet temperature — HEI assumes the gas leaves 4 °C (7.5 °F) below the saturation temperature, so at 80 mbar (41 °C saturation) the gas is at 37 °C with a vapour pressure of 63 mbar: the vapour is 79 % of the gas volume. The pump therefore removes roughly 5 kg of vapour for every kilogram of air, and the volumetric duty at the pump inlet is
V ≈ 12 kg/h air ≈ 10 Nm³/h × (1,013/80) × (310/273) × (80/17) ≈ 680 m³/h at 80 mbar
for a 100 MW-class unit on warm water. On 15 °C cooling water the same air load at 35 mbar is a smaller volume because the vapour fraction is lower — the Thai plant's pump is larger than its European twin's.
2. Two duties: hogging and holding
Hogging (start-up): the condenser shell, the turbine casing and the LP steam path — several hundred cubic metres — must be evacuated from atmosphere to about 200–300 mbar before steam is admitted to the turbine seals, in 20–40 minutes. A high-volume, short-duration duty on dry air: for a 400 m³ condenser to 250 mbar in 30 minutes,
S = (400 / 0.5 h) × ln(1,013/250) = 800 × 1.4 ≈ 1,120 m³/h
Holding (normal operation): the continuous removal of the leak air plus vapour at the condenser pressure, as above — 680 m³/h at 80 mbar for the example. The holding pump must reach the condenser pressure with margin: 80 mbar is comfortably above a liquid ring pump's 33 mbar ultimate with cool seal water, and marginal with 33 °C seal water (ultimate ~60 mbar). Hence the design practice below.
Plants install two 100 % holding pumps (one running, one standby — a condenser pressure excursion is a lost megawatt) and use both together for hogging; or a dedicated hogging ejector with the two holding pumps.
3. The standard machine: two-stage liquid ring, cooled, or hybrid
Liquid ring pumps have been the condenser air-extraction standard since the 1970s, displacing multi-stage steam ejectors (which used plant steam continuously). The reasons are the ones that recur in every wet duty: the vapour condenses in the ring, the pump runs cool and sealed, and it is indifferent to the condensate it swallows. The particular features of a power plant set:
- Two-stage liquid ring pumps (LT Series), which keep their capacity at 40–80 mbar better than single-stage, and reach 33 mbar.
- Seal water cooling: the pump's seal water in a closed loop through a heat exchanger on the condensate (the plant's coldest water, at the condenser temperature) or on the cooling water. The seal water temperature is the single largest influence on the pump's capacity at condenser pressure; the design cools it to within 2–3 °C of the cooling water.
- A pre-cooler / inter-condenser ahead of the pump on some sets, to condense part of the vapour and shrink the pump.
- Air-ejector hybrid: a steam or air ejector first stage on the pump inlet, which compresses the gas from the condenser pressure to 100–150 mbar where the liquid ring pump has its full capacity. This is the solution where the condenser must run at 40–50 mbar on warm seal water — the ejector decouples the pump's ultimate from the condenser pressure. The motive air for an air ejector is the pump's own discharge, recirculated: no steam needed.
- Materials: stainless steel impellers and port plates (condensate is pure water, slightly aggressive); carbon-steel casings are common.
- Separator on the discharge with level control, returning the condensed vapour to the condensate system — it is demineralised water and is worth recovering.
4. Sizing a 100 MW biomass unit
Condenser pressure 85 mbar (cooling tower at 32 °C), turbine exhaust 220 t/h, HEI design air 12.5 kg/h, condenser volume 350 m³, hogging to 250 mbar in 30 minutes.
- Holding: 12.5 kg/h air at 85 mbar, gas at 38 °C (vapour 66 mbar, 78 % of volume) → ~10.4 Nm³/h × 11.9 × 1.14 × 4.5 ≈ 640 m³/h at 85 mbar per 100 % pump, with seal water cooled to 35 °C. Two LT275-220-class two-stage pumps, each with its seal water cooler and separator; or two LT250-240 with an air-ejector first stage, which also lets the condenser be pulled to 60 mbar in the cool season for a few hundred extra kilowatts.
- Hogging: ~1,000 m³/h → both LT pumps running together at the higher pressure (their capacity near atmosphere is above nominal), reaching 250 mbar in about 30 minutes; or a hogging ejector on auxiliary steam if faster start-up is wanted.
- Controls: pumps on the condenser's air-cooler outlet through isolation and non-return valves; automatic changeover on discharge pressure or motor fault; seal water temperature and level alarms; air in-leakage measured at the pump discharge (a rotameter or thermal flow meter on the gas outlet) — the plant's leak indicator.
5. The air in-leakage number
A plant's air in-leakage is its vacuum health. HEI design is 12.5 kg/h for this unit; a tight new plant runs at 3–5; an old one at 20–40, and the pump cannot hold the condenser pressure — the operator sees rising back-pressure and blames the cooling tower. The remedies are leak detection (helium or SF₆ tracer gas sprayed at suspect joints with a detector on the pump discharge) and gland-seal steam pressure checks, not a bigger pump; but the pump's capacity at 2–3 times the HEI design air is what gives the plant time to find the leak without losing load, and it is the margin we size into every power plant set.
6. Other steam-plant vacuum
- Deaerator vacuum on feedwater — see Boiler feedwater and membrane deaeration.
- Vacuum priming of circulating-water pumps and siphon systems: a liquid ring pump pulling air out of the pump casings and the condenser water boxes at −300 to −600 mbar, intermittent — LM200-065 to LM270-155.
- Geothermal units, where the steam carries 1–10 % non-condensable gases (CO₂, H₂S): a vastly larger air-extraction duty served by multi-stage ejector-plus-liquid-ring hybrids, in stainless.
Recommended Dr.Vakuum machines
Two-stage liquid ring (LT Series), stainless internals, cooled seal water — holding pumps: LT230-160V (small units, 10–30 MW), LT250-240, LT275-220 (50–150 MW), LT380-320 and LT520-400 (larger units, or hogging).
Single-stage liquid ring (LS Series) — hogging pumps and priming: LS275-220, LS410-320.
Liquid ring monobloc (LM Series) — vacuum priming and small auxiliary duties: LM200-065, LM270-155.
The same condenser-and-non-condensables arithmetic, on a sugar mill's evaporators, is in Vacuum for sugar mill evaporators and vacuum pans — many Thai biomass units sit beside one.
Unit to set. Send us the turbine exhaust flow, the design condenser pressure, the cooling water temperature range and the condenser volume, and we will return the holding and hogging duties and a pump schedule with seal water cooling. Talk to an engineer.