Around Korat, Ayutthaya, Prachinburi and Pathum Thani, Thailand assembles roughly a third of the world's hard-disk drives and a large share of their components — heads, suspensions, actuator arms, media substrates — along with the precision optics, sensors and connectors that share the same cleanrooms and the same manufacturing habits. A hard-disk drive has a head flying 1–2 nanometres above a platter spinning at 7,200 rpm; a single particle of 0.3 µm is a head crash. Every machine that touches the product in that cleanroom is designed around particle and hydrocarbon exclusion, and many of them use vacuum to touch it at all.

1. Where vacuum appears in a drive factory

Process Vacuum duty Pressure Key requirement
Pick-and-place of platters, sliders, suspensions, arms Suction tweezers, cups and chucks on robots and manual stations −300 to −700 mbar, small flows Oil-free, particle-free, no backflow into the cleanroom
Vacuum chucks on disk inspection, servo writing, laser texturing Hold the disk flat and still −500 to −800 mbar Stable vacuum, no vibration transmitted
Adhesive and lubricant degassing Remove dissolved air from epoxy, UV adhesive, PFPE lubricant before dispensing 1–50 mbar Vapour of adhesive components; small volumes
Lamination / bonding of flex circuits, head-stack assemblies Vacuum-assisted press to avoid voids 10–100 mbar As PCB lamination
Media sputtering (magnetic layers on substrates) High vacuum deposition 10⁻⁷ to 10⁻³ mbar As PVD; cryopumps and turbos
Head wafer processing (thin-film heads) Semiconductor-type fab 10⁻⁸ to 10⁻² mbar Semiconductor pump sets
Helium-sealed drive test, leak test, and evacuation/backfill of sealed enclosures Evacuate the drive enclosure, fill with helium, test 1–10 mbar Dry, clean, hundreds of cycles per hour
Vacuum ovens for bake-out and outgassing of components Drive moisture and volatiles off before assembly 0.1–10 mbar Water and organic vapour

The first two rows are the bulk of the installed vacuum by count — a single assembly hall may have hundreds of suction points — and they are almost always served by a central cleanroom vacuum system with the pumps in the service chase outside the cleanroom wall.

Why can a cleanroom not have a vacuum pump inside it?

Because every pump — dry or oil-sealed — generates particles and heat, and some generate hydrocarbons. A dry vane pump sheds graphite from its vanes into its exhaust; an oil-sealed pump's exhaust is an oil mist; a claw or screw pump's exhaust is hot and carries whatever entered the inlet. Inside a Class 100 room (ISO 5 — fewer than 3,520 particles ≥ 0.5 µm per m³) the exhaust alone would fail the room, and the motor's cooling fan stirs the laminar flow. So the pumps sit in the service chase or subfab, their exhausts ducted to the building exhaust, and only stainless pipe enters the room — with a 0.01 µm filter at every cleanroom inlet point that stops particles travelling back into the room when a station is vented. The vacuum header is itself a potential particle path and is treated like a process gas line: electropolished stainless, orbital-welded, purged and particle-counted before use.

2. The central cleanroom vacuum system

Hundreds of small consumers, each drawing a few litres per minute when open, with a diversity of 20–40 %. Sizing by the lab/medical method:

  • A suction tweezer or small cup: 5–15 L/min when open (it is a small orifice at −500 mbar).
  • A vacuum chuck: 20–60 L/min continuous while the disk is held, more when it is released and re-seated.
  • A bonding or lamination station: 100–300 L/min during pump-down.

An assembly hall with 300 pick-and-place points, 40 chucks and 10 bonding stations: 300 × 10 × 0.3 + 40 × 40 × 0.8 + 10 × 200 × 0.3 ≈ 2,800 L/min ≈ 170 m³/h at −600 mbar, with duplex or triplex pumps. The pump choices:

  • Dry rotary vane (DRV Series, 90 mbar ultimate): −600 mbar is well within range; oil-free; the graphite dust stays on the exhaust side and is ducted. The historical choice for electronics cleanroom vacuum, and still the economical one. Three DRV100 in triplex for the hall above.
  • Dry claw (CL Series): non-contact, no vane dust at all, 150 mbar ultimate (−860 mbar); two CL150 in duplex. The modern specification for new halls.
  • Dry screw (DSI Series) where the same header must also serve the 10–50 mbar degassing and lamination duties: one DSI300 on a VSD with a 1 m³ receiver. Many plants run two headers — a "house vacuum" at −600 mbar on claw pumps and a "process vacuum" at 10 mbar on screw pumps — because mixing a 300-point handling network with deep process chambers makes both worse.

The header: stainless, 50–100 mm mains, sloped, with isolation per bay so a tool change does not vent the whole hall; a receiver (500–1,000 L) for the bonding stations' pump-down pulses; a pressure transmitter and VSD holding −600 mbar; and the inlet filters above.

3. Degassing adhesives and lubricants

Epoxies that bond the head to the suspension, UV adhesives on the flex, and the perfluoropolyether lubricant applied to the media at a few nanometres' thickness are all degassed before use: dissolved air would form bubbles in a bond line a few microns thick, or spit at the dispensing needle. Small vessels (0.5–5 L) are pulled to 1–20 mbar for minutes while the liquid is stirred or spread thin. The vapour is the adhesive's volatile components (reactive diluents, solvents) and PFPE — which has a very low vapour pressure and does not harm the pump, but the diluents do. A dedicated small pump per degassing station — a DV16 two-stage with a cold trap, outside the room, or a DSI150 on the process header — and never the house vacuum, which would spread the vapour to every tweezer in the hall.

4. Media sputtering and head wafer fabs

The platter's magnetic layers — a dozen sputtered films totalling under 100 nm — are deposited in in-line sputter systems: a chain of chambers each with its own cathode and its own high-vacuum pump, the disks passing through on carriers via load locks at 1,000–2,000 disks an hour. Base pressure 10⁻⁷ mbar; process 10⁻³ mbar argon. Each deposition chamber has a cryopump (CR300, CR500) or a turbo (T1300Z); the load locks cycle every few seconds and are roughed by dry screw pumps (DSI300) with Roots boosters (MB300); the whole machine is backed by a bank of dry pumps in the subfab. The arithmetic is in High vacuum for coating and load-lock evacuation. Head wafer fabs (thin-film heads on AlTiC wafers) are semiconductor fabs in every respect — the same dry pumps, turbos and cryopumps.

5. Sealed-drive helium fill and leak test

High-capacity drives are helium-filled and hermetically sealed: helium's low density lets the platters spin with less turbulence, so more of them fit in the enclosure. On the line, the drive is placed in a chamber, the chamber and drive evacuated to 1–10 mbar, the drive backfilled with helium, sealed (laser-welded cover), and then leak-tested — in a second evacuated chamber with a helium mass spectrometer, to leak rates of 10⁻⁷ mbar·L/s or better, since the drive must hold its helium for a decade.

The vacuum duty is a high-cycle small chamber: 5–20 L evacuated to 1 mbar in 10–20 seconds, hundreds of times an hour, with helium in the gas (which pumps are poor at compressing — the DSI's compression ratio on helium is lower than on air, so the set is sized with margin). A DSI150 or DSI300 per two to four stations through a receiver, dry nitrogen vent, and — for the leak-test chambers — a clean, trapped foreline to the spectrometer's own pump.

6. Installation and qualification

  • Pumps in the chase, on vibration isolators (a servo writer notices a pump 20 m away through the slab), exhausts to the scrubbed building exhaust, with exhaust particle filters on dry vane pumps.
  • Stainless, electropolished headers; orbital welds; helium leak check of the header at installation to 10⁻⁸ mbar·L/s per joint.
  • Point-of-use 0.01 µm filters and check valves at every inlet; particle counting of the vacuum line at commissioning (the line is evacuated and then vented through a counter).
  • Hydrocarbon-free: dry pumps only on any header that connects to a cleanroom; where an oil-sealed pump is unavoidable (an older degasser) a foreline trap and a separate, labelled header.
  • Monitoring: vacuum level per bay, pump current and temperature, filter differential — in the facility management system, with the cleanroom's other utilities.

Recommended Dr.Vakuum machines

Dry claw (CL Series) — house vacuum for handling and chucks, particle-free: CL80, CL150, CL300.

Dry rotary vane (DRV Series) — economical house vacuum with exhaust filtration: DRV60, DRV100.

Dry screw (DSI Series) — process vacuum headers, helium fill and test, load-lock roughing: DSI150, DSI300.

Turbomolecular (T Series) and cryopumps (CR Series) — media sputtering: T1300Z, CR300, CR500.

Two-stage vane (DV Series) — isolated degassing stations with cold traps: DV16.

The printed circuit board and SMT side of the same factories is covered in Vacuum lamination presses and vacuum reflow in PCB and SMT; the semiconductor back end in OSAT: die attach, moulding and wafer handling.