Semiconductor back-end (OSAT): die attach, transfer moulding and wafer handling
Thailand does not etch wafers — yet — but it packages a large share of the chips the world uses, in the assembly-and-test plants (OSATs, and the captive back-ends of the big device makers) of Ayutthaya, Pathum Thani, Lamphun and the Eastern Seaboard. A wafer arrives from a fab in Taiwan or Singapore; it leaves as thousands of tested, marked, taped packages. Between those two states, almost every machine on the floor holds, picks, places or seals the product with vacuum, and a handful of process steps need it deep. Unlike the front end's 10⁻⁸ mbar, back-end vacuum is mostly shallow — but it is clean, it is everywhere, and the line stops when it falters.
1. Vacuum by process step
| Step | Vacuum function | Level | Character |
|---|---|---|---|
| Wafer backgrinding | Porous ceramic chuck holds the wafer face-down while it is thinned to 50–200 µm | −600 to −900 mbar | Continuous; water and silicon slurry at the chuck edge |
| Wafer mounting and dicing | Chuck holds the taped wafer on the saw table; vacuum tooling on the frame handler | −500 to −800 mbar | Continuous; DI water, silicon dust |
| Die attach / die bonding | Pickup collet lifts the die (0.3–10 mm) from the tape; ejector needles below; bond head places it on the substrate | −500 to −800 mbar, tiny flows, millisecond switching | Hundreds of cycles a minute; nothing but air — must be absolutely clean and dry |
| Wire bonding | Heater-block clamp and strip hold-down; capillary handling | −400 to −700 mbar | Continuous, small |
| Transfer / compression moulding | Vacuum applied to the mould cavity during compound transfer to prevent voids and incomplete fill | 10–100 mbar for seconds | Mould-compound volatiles (epoxy, release agent), hot |
| Underfill and adhesive degassing | Degas flip-chip underfill, die-attach film and paste before dispensing | 1–20 mbar | Epoxy volatiles; small vessels |
| Plasma cleaning | Chamber evacuated for argon/oxygen plasma before bonding and moulding | 0.1–1 mbar | Process gas; dry pump |
| Bake ovens | Dehydration bake of substrates and strips before moulding (moisture → "popcorn" cracking) | 1–50 mbar or N₂ | Water vapour |
| Test handlers, tape-and-reel | Pick-and-place of packages; vacuum pockets on turrets | −400 to −700 mbar | Continuous, very many small points |
| Hermetic and cavity packages (sensors, MEMS, RF) | Evacuate and backfill the cavity before lid seal; vacuum-sealed MEMS | 10⁻² to 1 mbar | Deep; clean; small |
Two groups emerge. The handling and chucking group (rows 1–4, 9) is a central shallow-vacuum duty — oil-free, particle-free, hundreds of points, continuous — identical in character to the HDD cleanroom and served the same way. The process group (rows 5–8, 10) wants 10 mbar and below and carries vapour; it is served by dedicated pumps or a separate process header.
Why does a die bonder's vacuum have to switch in milliseconds, and what does that mean for the system?
Because the bonder's cycle is 50–200 ms per die: the collet descends, vacuum on, the ejector pushes the die up, the collet lifts, moves, places, vacuum off (and often a short blow-off), returns. If the vacuum at the collet takes 30 ms to build, the die is not held when the collet lifts. The switching is done by a fast valve a few centimetres from the collet; what the central system must provide is a stable, deep enough vacuum at the valve inlet at all times — the bonder draws a few litres per minute, but it draws them in pulses, and any sag in the header (another machine venting, a filter loading) shows up as a dropped die. Hence the design features: a receiver near each bonder bay, a header held at −700 mbar or deeper so the bonder's own regulator has headroom, and no shared header with the pulsing process chambers.
2. The central handling vacuum
A back-end floor with 60 die bonders, 80 wire bonders, 20 dicing saws, 12 grinders and 30 test handlers: estimate each bonder at 10 L/min, each wire bonder at 15, each saw and grinder at 60–100 (porous chucks leak by design), each handler at 30, with diversities of 0.5–0.9:
60×10×0.7 + 80×15×0.7 + 32×80×0.9 + 30×30×0.6 ≈ 420 + 840 + 2,300 + 540 ≈ 4,100 L/min ≈ 250 m³/h at −700 mbar
The chucks dominate — and their slurry water is the main hazard to the system. Design:
- Dry claw pumps (CL Series, 150 mbar ultimate = −860 mbar) in triplex: 3 × CL150 for the floor above, lead/lag/standby on a VSD-controlled header. Oil-free, non-contact, no vane dust. For smaller floors or an economical build, DRV dry vane pumps (−920 mbar) with exhaust filtration.
- Water separators at the saw and grinder bays: a transparent canister with a float shut-off at each machine, and a central knock-out pot — the porous chuck draws slurry when a wafer is lifted.
- Point-of-use 0.01 µm filters and check valves at every drop; the header in electropolished stainless, helium-leak-checked.
- Receivers per bonder bay (100–200 L) to hold the bonders' vacuum through header transients.
- Pumps in the subfab or chase, exhausts to the building exhaust, vibration-isolated (a bonder places to 10 µm).
3. The process group
Transfer and compression moulding. The strip of bonded dies sits in a heated mould at 175 °C; epoxy mould compound is forced into the cavities. Air trapped in a cavity becomes a void or an incomplete fill, and air trapped under a die becomes a delamination. Vacuum-assisted moulding evacuates the cavities to 10–100 mbar in the half-second before transfer, through vents on the mould connected to a vacuum tank — the same tank-and-fast-valve layout as vacuum die casting. The pump recovers the tank between shots and sees mould-compound volatiles (epoxy outgassing, release agent, hot air) that condense into a sticky film. A DRV60 or CL80 per press with a knock-out pot and a cold trap; some presses specify 10 mbar, which needs a DSI150 on a shared process header.
Underfill and adhesive degassing. Flip-chip underfill epoxy and die-attach adhesives are degassed in small vessels at 1–20 mbar — see the HDD note §3; a DV16 with cold trap, or the process header.
Plasma cleaning chambers (surface activation before wire bonding and moulding) pump to 0.1–0.5 mbar, run an Ar/O₂ plasma at a controlled gas flow, and vent — every few minutes. A DSI150 dry screw per two or three chambers; the gas is clean, and the duty is all cycle time.
Dehydration bake. Substrates and moulded strips absorb moisture from the Thai air; moisture flashing to steam in the reflow oven cracks the package ("popcorning", JEDEC J-STD-020). Bake ovens at 125 °C under nitrogen are standard; vacuum bake ovens at 1–10 mbar dry faster and are used ahead of moulding on sensitive packages — a vapour duty, DSI150 or DV60 with ballast.
Hermetic and cavity packages — MEMS gyroscopes and pressure sensors, RF modules, optical packages — are sealed with the cavity evacuated or backfilled with dry nitrogen or a getter-controlled atmosphere, at 10⁻² to 1 mbar, in a sealing chamber that holds a tray of packages: a DV90 two-stage pump with a trap, or a dry screw plus small booster where 10⁻³ mbar is specified. Volumes are small; cleanliness and ultimate are what matter.
4. Test and tape-and-reel
The test floor's handlers pick packages from JEDEC trays, press them into test sockets and sort them by bin — all with vacuum pickup on turrets and gantries — and the tape-and-reel machines do the same into carrier tape pockets. Hundreds of small suction points, cycling tens of times a second, drawing a few litres a minute each, at −500 to −700 mbar: the central handling vacuum's largest point count and smallest flow, served from the same claw-pump header with a receiver per cell.
5. Worked floor
A 25,000 m² OSAT: 60 die bonders, 80 wire bonders, 20 saws, 12 grinders, 30 handlers, 12 mould presses (vacuum-assisted), 6 plasma cleaners, 4 vacuum bake ovens, 2 hermetic sealing stations.
| Header | Pressure | Flow | Dr.Vakuum answer |
|---|---|---|---|
| House / handling | −700 mbar | ~250 m³/h | 3 × CL150 triplex, VSD, 1 m³ receiver + bay receivers, slurry separators at saws and grinders |
| Mould presses | 30 mbar tanks | 12 × 40 m³/h recovery | 12 × DRV60 with cold traps, or 2 × DSI300 on a process header |
| Plasma + vacuum bake | 0.1–10 mbar | 6 chambers + 4 ovens | 3 × DSI150 on a process header with condensate drains |
| Hermetic sealing | 10⁻² mbar | 2 stations | 2 × DV90 with foreline traps |
| Degassing stations | 5 mbar | 4 | 4 × DV16 with cold traps |
Recommended Dr.Vakuum machines
Dry claw (CL Series) — the house vacuum for chucks, collets and handlers: CL80, CL150, CL300.
Dry rotary vane (DRV Series) — mould presses and economical house vacuum: DRV60, DRV100.
Dry screw (DSI Series) — process headers: plasma, bake, deep moulding: DSI150, DSI300.
Two-stage vane (DV Series) — hermetic sealing and degassing with traps: DV16, DV90.
The front-end duty at the other end of the supply chain — the load lock at 10⁻⁶ mbar — is in Load-lock evacuation in a semiconductor fab; the PCB that the packaged chip is soldered onto is in Vacuum lamination and vacuum reflow.
Floor to headers. Tell us the machine counts by type and the process chambers, and we will return a house-and-process header design with pump schedule, receivers and separators. Talk to an engineer.