7 мин чтения

Thailand produces biogas at scale from palm oil mill effluent, cassava starch wastewater, ethanol stillage, pig farms and municipal landfill — more than a thousand plants feeding gas engines, boilers and, in a few cases, upgraders to biomethane. All of them move gas that is saturated with water, carries hydrogen sulphide, and varies in flow and composition with the feedstock and the weather. The machine that moves it has to tolerate all three, and the ones that do are a short list.

1. The gas

Raw biogas is 50–65 % methane, 35–50 % CO₂, saturated with water vapour at the digester temperature (35–40 °C mesophilic; at 38 °C the gas carries about 50 g of water per m³), with H₂S from 200 to 5,000 ppm (higher in palm oil and cassava effluent, which are sulphur-rich), traces of ammonia, siloxanes in landfill gas, and in landfill gas also oxygen and nitrogen drawn in through the cover.

Three properties set the equipment:

  • Saturated — any cooling condenses water, continuously, in every pipe and every machine. Condensate is acidic (H₂S and CO₂ dissolve in it; pH 4–5).
  • Corrosive — H₂S attacks carbon steel, copper, zinc and ordinary bearings; wet H₂S is far worse than dry.
  • Flammable — methane at 5–15 % in air; the machinery is in an ATEX zone, typically Zone 1 or 2 depending on the enclosure and ventilation.

2. Where vacuum and pressure appear

Extraction under vacuum. Landfill gas is drawn from wells across the site by a blower at −20 to −80 mbar at the wellhead, enough to collect gas without pulling excess air through the cover — too much vacuum draws oxygen in, which kills methane yield and creates an explosion risk in the pipe. Covered lagoon digesters in palm oil mills run the headspace at slight vacuum (−5 to −20 mbar) for the same reason: so a leak in the cover admits air rather than releasing methane.

Boosting to the consumer. Gas engines need 80–200 mbar at the inlet; boilers 20–50 mbar; a membrane or water-scrubbing upgrader 6–16 bar (compressors, not blowers). Between extraction and consumer sits the booster: a machine that takes gas at slightly below atmosphere and delivers it at 100–300 mbar above.

Flare. The emergency flare needs 20–50 mbar; often the same blower, on a diverter.

The booster's total pressure rise is therefore 100–400 mbar across the machine, at flows from 100 m³/h on a farm digester to 3,000–5,000 m³/h on a 2 MW palm-oil-mill plant.

Why liquid ring, for a gas that is already wet?

Precisely because it is already wet. A liquid ring machine compresses the gas in a ring of liquid, so the saturated gas and its condensate pass through without harming anything; the ring liquid absorbs the compression heat, so the discharge is cool and no further condensation happens downstream; and the ring liquid can be dosed to scrub H₂S as it pumps — a slightly alkaline closed loop takes out a large part of the sulphide, protecting the engine. Rotary vane and screw machines with oil would be ruined by the wet acid gas; Roots blowers run hot and dry and need the gas cleaned and dried first. The liquid ring tolerates what the gas actually is, and it has done so on digesters since the 1950s.

3. The closed-loop seal water system

A liquid ring pump on biogas runs on recirculated seal water, never once-through — once-through would discharge sulphide-laden water and consume tens of m³ a day. The loop:

  1. Pump discharges gas and seal water to a separator vessel (usually integral or skid-mounted) where the gas leaves the top and the water settles.
  2. Water returns to the pump through a plate heat exchanger cooled by cooling tower water or the digester's own heat-recovery loop, holding the ring temperature at 30–35 °C.
  3. Make-up water replaces what evaporates into the gas (the gas leaves saturated at the ring temperature) — typically 2–5 % of the circulation.
  4. Dosing: caustic soda to hold pH at 8–9 scrubs H₂S; or an iron salt that precipitates it. A bleed of 5–10 % keeps dissolved solids down; the bleed goes to the digester inlet, not the drain.
  5. Materials: stainless steel impeller, port plates and shaft; cast iron casing is acceptable with pH control, stainless better. Mechanical seals in silicon carbide; Viton elastomers (H₂S attacks Buna).

The gas leaving the separator is saturated at 30–35 °C — cooler and drier than it arrived, with much of the H₂S gone. A further chiller and knock-out before the engine brings the dew point down to 5 °C and removes the last of the water the engine does not want.

4. Roots and side channel blowers on the dry side

Where the gas is pre-treated — passed through a chiller, knock-out and desulphurisation (biological scrubber, activated carbon or iron oxide beds) before boosting — a dry blower becomes possible and is more energy-efficient than a liquid ring machine:

  • Roots blowers (RB Series) for 200–5,000 m³/h at 200–500 mbar rise: constant flow against a varying back-pressure (the engine's demand), simple VSD control, and a gas-tight design with mechanical shaft seals and a nitrogen or biogas-purged seal chamber so no gas escapes and no air enters. Materials: the standard cast iron is acceptable on dry desulphurised gas; coated rotors for landfill gas with residual H₂S.
  • Side channel blowers (1SC, 2SC Series) for small plants: 50–500 m³/h at 100–300 mbar, in gas-tight ATEX builds with the motor outside the gas path. A farm digester feeding a 100 kW engine runs on a single 1SC429-class gas-tight blower.

The rule: wet raw gas → liquid ring; dried, cleaned gas → Roots or side channel. Many plants use both — a liquid ring extraction machine that also scrubs, then a Roots booster after the chiller to the engine.

5. Condensate everywhere

Pipework from a digester falls continuously toward condensate traps — at every low point, before every machine, before the flare — because a slug of water in a blower inlet is the most common failure on a biogas plant. The traps are water-seal or float types rated for the line pressure (a 50 mbar vacuum line needs a 0.5 m seal leg; a 300 mbar pressure line needs a 3 m leg or a float trap). Condensate is pumped back to the digester. The pipe itself: HDPE for buried runs, stainless above ground; never galvanised steel, which H₂S strips in a year.

6. ATEX and safety

  • Zone classification by a competent person; the gas train is usually Zone 2 outdoors, Zone 1 inside enclosures.
  • Machines with ATEX-certified motors, gas-tight casings, non-sparking (bronze or coated) impellers where the gas path is Zone 1 internally (always, for a biogas blower — the inside is 100 % gas, but air ingress on a landfill makes it potentially explosive).
  • Flame arresters at the flare and at the engine inlet; a pressure and vacuum relief on the digester (the cover is the weakest vessel on the plant).
  • Oxygen monitoring on landfill gas, interlocked to the wellfield valves.
  • H₂S monitoring in the plant room, interlocked to ventilation.

7. A worked plant

A 2 MW palm oil mill biogas plant: covered lagoon, 1,200 Nm³/h of raw gas at 38 °C saturated, 3,000 ppm H₂S, two 1 MW engines needing 150 mbar at the inlet, biological scrubber between.

Stage Duty Dr.Vakuum answer
Extraction and first scrubbing 1,200 Nm³/h (~1,400 m³/h actual) from −15 mbar to +80 mbar, wet, acidic Two LS275-220 liquid ring (650 m³/h each) in parallel, stainless, closed-loop caustic-dosed seal water
Chilling and knock-out to 5 °C dew point Plate chiller + knock-out, condensate to lagoon
Biological desulphurisation to < 200 ppm Scrubber (by others)
Engine boost 1,200 Nm³/h, 20 → 180 mbar Two RB100 gas-tight Roots blowers (348–802 m³/h each), VSD, lead/lag
Flare 1,200 Nm³/h at 30 mbar From the extraction pumps via diverter

Redundancy is in pairs because the lagoon produces gas whether or not the plant is ready to take it.

Recommended Dr.Vakuum machines

Liquid ring (LM / LS / LT Series), stainless, closed-loop — raw wet gas extraction and scrubbing: LM200-065 (105 m³/h, farm and small plants), LM270-155 (375 m³/h), LS275-220 (650 m³/h), LS410-320 (1,400 m³/h).

Roots blowers (RB Series), gas-tight — dry treated gas to engines and upgraders: RB050 (59–175 m³/h), RB065 (124–310 m³/h), RB100 (348–802 m³/h), RB150 (799–1,910 m³/h).

Side channel (1SC / 2SC Series), gas-tight ATEX — small plants: 1SC429, 2SC4337.

The aeration blowers on the plant's wastewater side are the same Roots machines in pressure duty — see Aeration tank wastewater treatment with Roots blowers.

Gas analysis to machine. Send us the gas flow range, H₂S level, temperature and the pressure the consumer needs, and we will specify the extraction and boosting machines with the seal water loop and materials. Talk to an engineer.