Physical vapour deposition puts a thin film of metal or ceramic onto a surface by evaporating or sputtering it in vacuum, where the atoms travel in straight lines to the part without hitting air. Thailand has all of it: decorative PVD on bathroom fittings and consumer goods, hard coatings on cutting tools and moulds, aluminium metallising of headlamp reflectors and plastic trims, and roll-to-roll metallising of packaging film for the snack and coffee industries. The physics and the pumps are the same; the chamber shape and the production rhythm differ.

1. The pressures and why

Process Working pressure Why
Thermal / e-beam evaporation (aluminium reflectors, metallised film) 10⁻⁴ – 10⁻⁵ mbar The mean free path must exceed the source-to-substrate distance (metres), so the vapour arrives undisturbed; residual gas would oxidise the aluminium and dull the mirror
Magnetron sputtering (decorative, optical, hard coatings) 10⁻³ – 10⁻² mbar of argon Sputtering needs a plasma, so argon is admitted; but the chamber must first reach 10⁻⁵ – 10⁻⁶ mbar base pressure to remove water and oxygen before the argon is let in
Cathodic arc (TiN, CrN tool coatings) 10⁻³ – 10⁻² mbar of N₂ or Ar As sputtering; reactive gas forms the nitride
Plasma pre-cleaning / etching 10⁻² – 10⁻¹ mbar Glow discharge to clean the parts

The base pressure before deposition is what sizes the high-vacuum stage and decides the film quality; the working pressure with process gas flowing sizes the throughput the set must handle while coating.

Why is water vapour the enemy in a coating chamber?

Because almost everything that stops a chamber reaching 10⁻⁵ mbar is water. Air is gone from a chamber within minutes; what remains is water adsorbed on every surface — chamber walls, fixtures, and the parts themselves (plastics, especially, hold a great deal) — desorbing slowly for hours. In Bangkok a chamber opened for ten minutes to load parts picks up a monolayer of water on everything, and a 2 m³ chamber then has a water load of grams, which at 10⁻⁵ mbar is thousands of cubic metres of vapour. A pump cannot remove water fast enough; a cold surface can. A Meissner trap — a coil inside the chamber chilled to −100 to −130 °C by a refrigerant or liquid nitrogen — condenses water at a rate equivalent to tens of thousands of litres per second of pumping speed, for a few kilowatts. Every production coater in a humid climate has one, or a cryopump whose first stage does the same job; without it pump-down times double and films come out hazy.

2. The stages of a batch coater

A 2 m³ sputter chamber for decorative coating of tap fittings, cycle target 90 minutes, base pressure 5 × 10⁻⁶ mbar, process at 3 × 10⁻³ mbar with 300 sccm of argon.

Rough (1,013 → 0.1 mbar), 5 minutes. S = (2 / 0.083) × ln(1,013/0.1) = 24 × 9.2 ≈ 220 m³/h at the plateau, plus the knee and the first water → a DSI300 dry screw (300 m³/h, 0.05 mbar). Dry, because the sputter chamber produces oxide dust and reactive gas by-products that degrade pump oil, and because any oil back-streaming during the crossover to high vacuum ends up in the film. A DV275 two-stage vane pump with a foreline trap is the cheaper alternative on decorative lines.

Fine (0.1 → 10⁻³ mbar), 2–3 minutes. A Roots booster — MB600 (2,000 m³/h) on the DSI300 — takes the chamber through the band where the dry screw alone slows, and brings it to the pressure where the high-vacuum pump's gate valve can open.

High vacuum (10⁻³ → 5 × 10⁻⁶ mbar), 20–40 minutes dominated by water. A cryopump — CR500, ~3,500 L/s nitrogen and far more for water — or a turbomolecular pump — T1600, 1,600 L/s — backed by the DSI300. Cryopumps dominate decorative and hard-coating sputtering because of their water speed and oil-free cleanliness; turbos dominate where the process gas load is high and continuous (reactive sputtering of oxides), since a cryopump saturates. The booster is closed off once the high-vacuum pump takes over; the DSI300 backs the turbo, or is free to rough the next chamber in a multi-chamber line.

Process (3 × 10⁻³ mbar, 300 sccm argon). Throughput Q = 300 sccm ≈ 5 mbar·L/s. A turbo at 1,600 L/s would sit at 3 × 10⁻³ mbar with the gate valve throttled; a cryopump would accumulate 5 mbar·L/s × 3,600 s × … — about 2 × 10⁷ mbar·L per hour, so a CR500's argon capacity of roughly 10⁹ mbar·L (10⁸ Pa·L) is reached in a few days of continuous sputtering and the pump regenerates weekly. On an argon-heavy process, throttling the cryopump's inlet extends the interval.

The whole set: CR500 + HC80W compressor, MB600, DSI300, a Meissner trap, gate valves and a controller that sequences them. Pump-down to base pressure in 35–45 minutes with the Meissner trap, 60–80 without.

3. Roll-to-roll metallising

A film metalliser evaporates aluminium from resistively heated boats onto a web of plastic film (BOPP, PET) running at 10–15 m/s, several metres wide, for the metallised packaging of snacks, coffee and insulation. The chamber is differentially pumped:

  • The winding chamber holds the unwind and rewind rolls — a roll of film has a huge surface area and outgasses continuously. It is held at 10⁻¹ to 10⁻² mbar by a large booster set: MB1200 on a DSI630, often two such sets on a wide machine, pumping thousands of cubic metres per hour of water vapour and air.
  • The deposition chamber, separated from the winding chamber by narrow slits the web passes through, is held at 10⁻⁴ mbar by diffusion pumps (traditionally) or large turbos/cryopumps, backed by the booster sets.

The duty is continuous throughput, not pump-down: the outgassing web is a steady gas load for the hours-long run. Sets are sized on it, and the metalliser's winding-chamber pumps are among the largest booster installations in any factory. Oil-free backing has become standard because aluminium oxide dust and the film's additives foul oil-sealed pumps.

4. Metallising plastic parts

Headlamp reflectors, cosmetic caps and automotive trims are metallised in batch evaporation coaters: a 1–3 m³ chamber, parts on rotating planetary fixtures, aluminium boats, often a plasma pre-treatment and a protective top-coat. Base pressure 10⁻⁴ mbar; cycle 10–20 minutes, so the pump-down must be fast: a large booster set plus a diffusion pump or cryopump, and — because plastic parts are the worst outgassers — a Meissner trap is essential. A 2 m³ reflector coater: MB1200 + DSI300 roughing to 10⁻² mbar in 3 minutes, then a diffusion pump or CR500 to 10⁻⁴ in 5 more.

5. Running points

  • Venting with dry nitrogen, never room air, keeps the next cycle's water load down more than any pump upgrade.
  • Load locks on high-throughput lines keep the main chamber under vacuum permanently — see the load-lock evacuation note.
  • Leak checking with helium at commissioning and whenever the base pressure drifts; fixture feedthroughs and viewports are the usual culprits.
  • Cryopump regeneration scheduled against the argon throughput; two cryopumps alternating on a continuous line.
  • Dust: sputtered material that misses the parts flakes off the shields; shields are cleaned or replaced on schedule, and the roughing line has a filter.
  • Cooling water for the cryo compressor, turbo or diffusion pump and the booster — the one utility that limits a Thai plant room.

6. Worked coaters

Coater Chamber Base / process Rough Fine High vacuum
Tool-coating arc, 0.5 m³ 0.5 m³ 10⁻⁵ / 10⁻² N₂ DV90 or DSI150 MB150 T1300Z
Decorative sputter, 2 m³ (above) 2 m³ 5×10⁻⁶ / 3×10⁻³ Ar DSI300 MB600 CR500 + Meissner
Reflector metalliser, 2 m³, 15 min cycle 2 m³ 10⁻⁴ DSI300 MB1200 Diffusion or CR500 + Meissner
Web metalliser, 2.4 m wide 15 m³ 10⁻² winding / 10⁻⁴ deposition 2 × DSI630 2 × MB1200 Diffusion pumps or CR1000
Optical sputter, 1 m³, reactive oxide 1 m³ 10⁻⁶ / 5×10⁻³ Ar+O₂ DSI150 MB300 T1600 (continuous gas load)

Recommended Dr.Vakuum machines

Dry screw (DSI Series) — roughing and backing, oil-free: DSI150, DSI300, DSI630.

Roots boosters (MB Series) — the fine-vacuum stage: MB150, MB300, MB600, MB1200.

Cryopumps (CR Series) and compressors (HC) — high water speed, oil-free: CR300, CR500, CR1000, HC80W.

Turbomolecular (T Series) — continuous process gas: T1300Z, T1600, T4200.

Two-stage vane (DV Series) — economical roughing on decorative lines: DV90, DV275.

How the high-vacuum pump and its backing pump are matched is set out in High vacuum for coating and analytical instruments.

Coater to set. Tell us the chamber volume, the base and process pressures, the process gas flow and the cycle time, and we will size the three stages and the Meissner trap together. Talk to an engineer.