Thailand refines about three million tonnes of crude palm oil a year, and every tonne passes through two vacuum vessels: the bleacher, where adsorbent earth removes colour and gums at 50–100 mbar, and the deodoriser, where steam stripping at 2–5 mbar and 240–260 °C removes free fatty acids, odour compounds and residual pigments. The deodoriser is the deepest vacuum in any food plant, it is held continuously through a 330-day year, and its vacuum system is typically the refinery's second-largest energy consumer after the boiler.

1. What the deodoriser vacuum has to remove

The deodoriser is a column or tray vessel at 2–5 mbar absolute (1.5–4 Torr) into which stripping steam — 0.5–2 % of the oil throughput, say 5–20 kg per tonne of oil — is sparged. The vacuum system sees:

  • Stripping steam, the dominant load by mass: for a 1,000 t/d refinery at 1 % steam, 10 t/d = 417 kg/h of water vapour.
  • Free fatty acids (FFA) and other volatiles stripped from the oil: crude palm oil at 4 % FFA refined to 0.05 % liberates about 1,650 kg/h of fatty acid distillate for the same refinery, most of which must be condensed before the vacuum system.
  • Non-condensables: air leakage into a vessel at 3 mbar and 250 °C (large, hot, many flanges), plus dissolved air from the oil. Usually estimated at 20–60 kg/h for a vessel of this size.

The fatty acid distillate is caught in a fatty acid scrubber — a direct-contact condenser circulating cooled distillate at 50–60 °C — mounted on the deodoriser vapour outlet. What passes the scrubber is stripping steam, non-condensables and a small FFA carry-over, at 2–5 mbar and 50–60 °C. That stream is the vacuum system's duty.

Why can't a mechanical pump take the deodoriser directly?

Because at 3 mbar the stripping steam alone is an enormous volume. 417 kg/h of water vapour at 3 mbar and 55 °C occupies

V = 417 × (8.314 × 328 / 18) / 300 Pa ≈ 210,000 m³/h

No mechanical pump handles that; a bank of Roots boosters would be dozens of machines. The steam must be condensed first, which at 3 mbar means a condensing surface below the saturation temperature at that pressure — −5 °C. That is the whole design problem of deodoriser vacuum: either compress the vapour with steam ejectors to a pressure where cooling-tower water can condense it, or condense it with chilled surfaces at 3 mbar and pump only the non-condensables.

2. Three ways to do it

Steam-jet ejector system (the traditional one). Three or four ejector stages with inter-condensers compress from 3 mbar to atmosphere. The first stage (a "booster ejector") compresses the whole vapour load from 3 to about 50 mbar, where 32 °C cooling water can condense it; subsequent stages take the non-condensables onward. Motive steam consumption is severe — the booster alone uses 3–6 kg of motive steam per kg of load, so a 1,000 t/d refinery spends 1.5–3 t/h of 10-bar steam on vacuum, continuously. The cooling water flow is also large (the barometric condenser water becomes a fatty, odorous effluent).

Liquid ring system (bleacher, and the back end of hybrids). A liquid ring pump reaches 33 mbar with cool seal water and cannot reach 3 mbar alone. It replaces the last ejector stages, cutting their steam, and it is the natural pump for the bleacher at 50–100 mbar.

Dry-condensing (ice-condensing) system. The modern answer for new refineries and the retrofit of choice. The deodoriser vapour, after the fatty acid scrubber, enters a surface condenser cooled to −25 to −30 °C by a refrigeration circuit; the stripping steam freezes onto the tubes as ice at 3 mbar. Two condensers alternate — one freezing, one defrosting with warm glycol — and the non-condensables, now dry and cold, go to a mechanical pump set: a Roots booster backed by a liquid ring pump or, where the plant wants no water, by a dry screw. Motive steam falls to zero, the barometric effluent disappears, and the electrical load (refrigeration plus pumps) is typically 30–40 % of the ejector system's steam energy.

Steam ejector Dry-condensing + Roots/liquid ring
Deodoriser pressure 2.5–4 mbar 1.5–3 mbar (lower, because no booster suction loss)
Steam use (1,000 t/d) 1.5–3 t/h ~0 (defrost uses waste heat)
Electricity Small (pumps for condenser water) 300–500 kW (refrigeration + pumps)
Effluent Barometric water, 50–100 m³/h, fatty None from vacuum; FFA recovered
Turndown Poor Good — refrigeration and VSD follow load
Capital Low High
Payback on retrofit — 2–4 years at Thai steam and power prices

3. Sizing the mechanical pump set in a dry-condensing system

The pump set sees only what passes the ice condenser: non-condensables saturated at the condenser outlet, −25 °C and 3 mbar (vapour pressure of ice at −25 °C is 0.6 mbar, so vapour is 20 % of the gas), plus defrost vapour spikes.

For the 1,000 t/d refinery: 40 kg/h of air ≈ 33 Nm³/h, with vapour fraction → ~35 Nm³/h of gas at the inlet. At 3 mbar and 248 K:

V = 35 × (1,013 / 3) × (248 / 273) ≈ 10,700 m³/h at 3 mbar

A Roots booster at the inlet compresses to 30–50 mbar, where a liquid ring pump takes over:

  • Booster: MB4200-class, or two MB1200 (4,140 m³/h each) in parallel for redundancy through a 330-day run. Boosters are sized on the inlet volume and are happy at 3 mbar.
  • Backing: at 40 mbar the volume is 10,700 × (3/40) ≈ 800 m³/h (less, as the vapour has condensed further) — one LT380-320 or LT250-240 class two-stage liquid ring pump with chilled seal water, or a DSI1200 dry screw where the refinery wants no seal water at all.

A Roots booster's compression ratio is 5–10 at these pressures, so the backing pump pressure of 30–50 mbar is the design point for the whole set — and the reason a liquid ring pump with warm seal water (33 mbar ultimate at 20 °C, 60 mbar at 32 °C) must be run chilled or replaced by a two-stage unit. The refrigeration circuit that freezes the condenser can supply that chilled water cheaply.

4. The bleacher

The bleacher is a different and easier duty: 50–100 mbar, 90–110 °C, with oil sprayed over bleaching earth and the vapour load being the moisture in the crude oil (0.1–0.3 %) plus air leakage. For 1,000 t/d at 0.2 % moisture, 83 kg/h of water vapour at 70 mbar and 60 °C:

V ≈ 83 × 1.5 × (1,013/70) ≈ 1,800 m³/h of vapour — plus 20 kg/h of air, another 300 m³/h.

The gas carries bleaching earth dust from the vessel and is saturated with water — the classic liquid ring duty. A knock-out pot with a sight glass ahead of the pump, and the pump in stainless steel: an LS410-320 (1,400 m³/h) with a condenser upstream, or an LS520-400 (2,600 m³/h) without one. The condenser is cheaper than the larger pump and reduces the seal water contamination.

5. Operating details that decide uptime

  • Fatty acid in the pump. Any FFA that passes the scrubber solidifies below 40 °C. Keep the inlet lines to the pump set traced above 50 °C and the ice condensers' defrost water routed to the fat trap, not the drain.
  • Seal water chemistry. Liquid ring seal water on a deodoriser back end becomes acidic from fatty acids (pH 4–5). Stainless steel pump, and a caustic dosing point on the recirculation tank.
  • Air leakage. The ejector era taught refineries to tolerate leakage because steam is cheap. A mechanical set is sized on the leakage, so a leak test (pressure rise rate with the system isolated) every quarter, and tightening of the deodoriser manways, pays directly in pump size and power.
  • Redundancy. The deodoriser cannot stop; two boosters or one booster with a bypass to the backing pump (which holds the vessel at a degraded 30 mbar while the booster is changed) is the minimum.

Recommended Dr.Vakuum machines

Roots boosters (MB Series) — the inlet stage of a dry-condensing set, sized on inlet volume at 2–5 mbar: MB600 (2,000 m³/h), MB1200 (4,140 m³/h), MB4200.

Two-stage liquid ring (LT Series) — backing the booster at 30–50 mbar with chilled seal water, and standalone on smaller refineries' bleachers: LT250-240, LT380-320, LT520-400.

Single-stage liquid ring (LS Series) — bleacher vacuum, wet and dusty: LS410-320, LS520-400.

Dry screw (DSI Series) — backing where seal water is unwanted: DSI630, DSI1200.

The sugar industry's evaporator and pan vacuum is the shallower cousin of this duty — see Vacuum for sugar mill evaporators and vacuum pans.

Retrofit study. Send us the refinery capacity, stripping steam rate, deodoriser pressure, and the current ejector steam consumption. We will size a dry-condensing back end and show the steam saving. Talk to an engineer.