Dr.Vakuum
Alle Anwendungen

EPS and foam moulding: vacuum assist for filling, fusion and cooling

7 Min. Lesezeit

Thailand's seafood exporters ship in expanded polystyrene boxes, its electronics and appliance makers pack in EPS inserts, its construction industry insulates with EPS blocks, and its automotive suppliers mould expanded polypropylene (EPP) bumper cores and seat parts. All of it is made on shape-moulding machines that fill a mould cavity with pre-expanded beads, fuse them with steam, cool the part and eject it, in a cycle of 60–180 seconds. Vacuum appears in that cycle three times, and on a modern machine it is the difference between a two-minute cycle and a one-minute cycle.

1. The three vacuum steps

Vacuum fill. Beads are blown into the closed mould with air through fill guns. Air must leave the cavity as fast as beads enter it; the mould's core vents are small. Applying vacuum to the steam chambers behind the mould halves — so air is drawn out through the vents as beads are blown in — fills thin walls, deep ribs and complex shapes completely and evenly. Pressure: −300 to −600 mbar behind the mould, for 2–5 seconds.

Vacuum steaming (vacuum fusion). Steam at 0.6–1.2 bar is admitted to one steam chamber and drawn through the bead mass to the other, where vacuum pulls it out. Instead of steam diffusing slowly into a cavity full of air, the air is removed first and the steam flows through the beads, heating them uniformly to 110–120 °C where they soften, expand and fuse. Cross-steaming under vacuum shortens the fusion step and gives a part fused evenly to the core — a thick fish-box corner that would otherwise be weak. Pressure: −500 to −800 mbar briefly before each steam admission.

Vacuum cooling. After fusion the part is at 110 °C and the mould is wet with steam condensate. Conventionally, water is sprayed on the back of the mould and the machine waits — the longest step in the cycle. With vacuum applied to the steam chambers at −800 to −900 mbar, the condensate film on the mould and the moisture in the part boil at 45–55 °C, taking their latent heat out of the aluminium and the polystyrene: evaporative cooling, exactly as in vacuum cooling of cooked food. The part reaches its demoulding temperature in a third of the time, and it leaves the mould drier, so it needs less oven drying before shipment.

Why does vacuum cooling cut the cycle so sharply?

Because the conventional cooling step is limited by heat conduction through the part — EPS is an insulator; that is its whole purpose — and by the time it takes water sprayed on the mould back to carry heat away. Vacuum cooling attacks the problem from inside: the moisture that the steam left in the bead mass boils under vacuum and carries heat out from within the part, not just from its skin. A 50 mm thick fish-box wall that takes 60 seconds to cool to 70 °C by spray takes 20–25 under vacuum, and it stabilises faster afterward because the internal pressure of the beads — the "post-expansion" force that makes a warm part grow after ejection — is relieved as the moisture leaves. Machine builders quote 30–50 % shorter cycles on thick-walled parts and claim it is the single largest productivity improvement available on an existing machine.

2. What the pump sees

The gas from the steam chambers is as bad as vacuum gas gets:

  • Steam — the chambers are full of it when vacuum is applied for cooling, and the pump pulls saturated vapour at 50–100 °C.
  • Condensate — litres of hot water per cycle, as droplets and slugs.
  • Air, in the fill and pre-steaming steps.
  • Pentane — the blowing agent in EPS beads, 3–6 % by weight when fresh, released during steaming; a flammable hydrocarbon that reaches the pump in low concentration (the plant's ventilation is designed for it).
  • Bead dust and polystyrene fines, and traces of the mould release agent.

There is one pump type for this: the liquid ring pump. It condenses the steam in its own water ring (which is what the vacuum cooling step relies on — a dry pump would have to move the steam as vapour, thousands of cubic metres per hour), swallows the condensate slugs, runs cool, and is unbothered by fines and pentane traces. EPS machines have been built around liquid ring pumps since vacuum assist was introduced; the machine's vacuum tank (300–1,000 L, held at −900 mbar) is pumped by the liquid ring unit between cycles and dumped into the steam chambers through large valves at each vacuum step.

3. Sizing

A 1,200 × 1,000 mm shape-moulding machine, two steam chambers of about 200 L each, vacuum tank 800 L, cycle 70 seconds with vacuum fill, vacuum cross-steaming and vacuum cooling.

  • Per cycle, air and vapour removed: the chambers (400 L) are dumped into the tank three times a cycle, the first two from near atmospheric air/steam mixtures, the third from steam at 1 bar which mostly condenses in the tank and the pump. Call the pump's recovery duty the tank from 400 to 100 mbar in 50 seconds plus the vapour: (0.8 / 50 s) × ln(400/100) × 3,600 ≈ 80 m³/h of air equivalent, plus perhaps 3–5 kg of condensate and vapour per cycle (150–250 kg/h) — which the liquid ring pump condenses but which costs it capacity and heats its seal water.
  • Machine builders fit liquid ring pumps of 150–400 m³/h nominal per machine of this size, the upper end for machines running thick parts with vacuum cooling as the dominant step. An LM230-120 (230 m³/h) or LM270-155 (375 m³/h).
  • Seal water at 150–250 kg/h of condensed steam into the ring is a serious heat load: 150 kW of latent heat. The pump's seal water must be cooled — a separator tank with a heat exchanger on the plant's cooling tower, or once-through at 2–4 m³/h, which many EPS plants do because they have water and the condensate itself tops the loop up. Seal water at 40 °C costs 30 % of the pump's capacity at −900 mbar; at 25 °C, much less.

Central systems. A plant with eight to twenty machines runs a central vacuum plant — three or four LS275-220 (650 m³/h) or LS410-320 (1,400 m³/h) pumps on a header at −900 mbar, each machine keeping its own tank and valves. Diversity is excellent (machines are rarely in their vacuum step simultaneously), the seal water system is one engineered loop instead of twelve improvised ones, and the pumps are out of the hot, humid, pentane-laden moulding hall. Sizing: the sum of the machines' tank-recovery duties times 0.5–0.6, delivered at −900 mbar on the hot-season seal water curve.

4. Installation points

  • Separator vessel on the pump discharge with a condensate overflow to the plant's hot-water recovery — the condensate is clean hot water and is worth returning to the boiler feed.
  • Strainer on the seal water recirculation; fines accumulate.
  • Pentane: the pump's gas discharge goes to the plant's vented exhaust, not into the plant room; ATEX zoning around the machines applies to the vacuum tank vents too.
  • Materials: condensate is slightly acidic from pentane oxidation products and from the water treatment; stainless impellers.
  • Vacuum gauge on each machine tank — the operator reads the vacuum level before each steaming step; a tank that reaches only −700 mbar is a pump or seal water problem and a fusion problem in the same breath.

5. Worked plants

Plant Machines Duty Dr.Vakuum answer
Fish-box plant, 2 machines 2 × 1,400 × 1,200 mm, thick parts 400 m³/h each 2 × LM270-155, cooled seal water
Packaging inserts, 6 machines 6 × 1,000 × 800 mm 150–200 m³/h each Central: 2 × LS275-220 + 1 standby, −900 mbar header
EPP automotive, 4 large machines 4 × 1,500 × 1,200 mm, high pressure steam 400 m³/h each Central: 2 × LS410-320, seal water chiller
Block mould (insulation) 1 × 6 m block mould Vacuum fill and cooling, 1,000 m³/h LS410-320

Recommended Dr.Vakuum machines

Liquid ring monobloc (LM Series) — one per machine: LM200-065 (105 m³/h, small machines), LM230-120 (230 m³/h), LM270-155 (375 m³/h).

Liquid ring single-stage (LS Series) — central plants and block moulds: LS275-220 (650 m³/h), LS410-320 (1,400 m³/h).

The injection-moulding hall next door is a different vacuum duty — dry, deep and oil-free — covered in Central vacuum for an injection moulding facility.

Machine to pump. Tell us the machine platen size, the tank volume, the cycle and whether you run vacuum cooling, and we will size the pump and its seal water system — per machine or central. Talk to an engineer.