Thailand has become one of the larger solar module manufacturing bases outside China, with multi-gigawatt plants in Rayong, Chonburi and Prachinburi assembling cells into the glass-and-polymer sandwich that is a PV module. The step that gives the module its 25-year weather seal is lamination: the layered stack goes into a flat vacuum laminator, the chamber is evacuated to a few millibar, the stack is heated to 140–160 °C on the platen, a membrane presses it, and the encapsulant — EVA or POE sheet — melts, flows around the cells and ribbons, and cross-links into a solid, transparent, adhesive layer. If any air is left in the stack when the encapsulant flows, it becomes a bubble; a bubble becomes a delamination path for moisture, and a module that fails in the field. The vacuum pump is what removes that air, and it has about four minutes to do it.

1. The lamination cycle

  1. Load: the stack (glass down, EVA, strung cells, EVA, backsheet; or glass-glass) is placed on the cold-side platen, chamber closed.
  2. Pump-down: both the lower chamber (around the stack) and the upper chamber (above the membrane) are evacuated together to 1–5 mbar in 3–6 minutes, while the platen heats the stack. Air leaves the stack through the layers' edges and through the EVA's embossed surface channels — this is why EVA sheet is textured.
  3. Press: the upper chamber is vented to atmosphere; the membrane, with 1 bar on it, presses the stack onto the hot platen. The EVA melts (70–80 °C), flows, and begins to cross-link at 140–150 °C.
  4. Cure: 8–15 minutes at temperature (fast-cure EVA) under pressure. The lower chamber stays under vacuum throughout to draw off the gas the curing encapsulant releases.
  5. Vent and unload; the module goes to a cooling press or a second laminator stage.

Modern lines use multi-stage laminators: a first chamber for pump-down and melt, a second (and third) for cure and cool, with the module transferred between them on a belt, so the throughput is one module every 4–6 minutes per lane rather than every 15–20. The vacuum duty then concentrates on the first chamber.

Why must the pump reach 1–5 mbar in four minutes when the EVA only needs air removed?

Because the air that matters is the air inside the stack, and it can only escape through long, thin paths — between the cells and the glass, along the embossing channels of the EVA, out to the edges — while the EVA is still solid. Once the EVA melts, at 70–80 °C, the channels close and any air still inside is trapped. The platen is heating the stack during pump-down, so the race is between the chamber pressure falling (which pulls air out of the stack by the pressure difference) and the EVA reaching its melt temperature. The chamber must be at well under 10 mbar by the time the EVA melts, and since the stack's internal pressure lags the chamber's, the chamber target is 1–5 mbar reached in the 3–6 minutes the platen takes to bring the stack from 20 to 80 °C. A slower pump means a lower platen temperature at the start, a longer cycle and fewer modules an hour; or bubbles.

2. Sizing the laminator pump

A single-chamber laminator for 2.3 × 1.2 m modules (two per cycle), chamber volume about 1.5 m³ (the chambers are flat and shallow), target 2 mbar in 4 minutes:

S = (1.5 / 0.067 h) × ln(1,013 / 2) = 22.5 × 6.2 ≈ 140 m³/h at the plateau

— then the knee: 2 mbar is four times a single-stage pump's ultimate, and the last decade (20 → 2 mbar) takes as long as the first two. A single-stage V301 (300 m³/h, 0.5 mbar) gets there in about 4 minutes; a two-stage DV175 (160 m³/h, 5 × 10⁻³ mbar) does it in a similar time with a much smaller machine because it holds its speed through the last decade. Laminator builders ship machines of this size with 160–300 m³/h pumps; the larger multi-lane and glass-glass laminators (3–6 m³ chambers) with 300–640 m³/h (V630) or a Roots booster on a two-stage pump (MB300 + DV175) for a two-minute pump-down.

During cure the pump holds 1–5 mbar against the outgassing of the curing encapsulant — small in volume but chemically the whole maintenance problem.

3. What EVA does to a pump

EVA (ethylene-vinyl acetate) cross-links through a peroxide curing agent, and the reaction releases volatile organic by-products — acetone, tert-butanol, methane, and from the vinyl acetate groups acetic acid. POE (polyolefin elastomer) encapsulants release less acid but still outgas peroxide decomposition products. These arrive at the pump at a few millibar, hot, and:

  • Dissolve into mineral oil, raising its vapour pressure (the ultimate rises, the pump-down slows) and acidifying it; acetic acid corrodes the pump's steel internals through the oil.
  • Condense on cold surfaces in the inlet line and the pump's inlet as a waxy, acidic film.
  • Degrade elastomer seals that are not Viton or FFKM.

Laminator pumps that run without protection need oil changes every 200–400 hours and vane sets every year or two. Protection:

  • A cold trap or chilled condenser on the laminator's vacuum outlet, at 0–5 °C, which condenses most of the acetic acid and tert-butanol before the pump; drained daily to a waste container.
  • Gas ballast open during cure (vapour), closed during the last minute of pump-down if the ultimate needs it.
  • Oil changes by condition — a total acid number test strip on the oil weekly, or a fixed 500-hour interval with the trap.
  • Exhaust oil mist separator, drain to waste (not back to the pump), exhaust ducted to the plant's VOC abatement.
  • Stainless or coated gas-path parts, Viton seals.

The oil-free option is a dry screw pump (DSI150, DSI300): the acid and volatiles pass through the hot rotors as vapour to an exhaust-side condenser, there is no oil to acidify, and the 0.05 mbar ultimate is ample for a 2 mbar target. Dry screw pumps cost more and are what the newest large plants in Thailand have specified, for the oil, the VOC handling and the uptime. Their requirement: a nitrogen purge on the seals and a heated inlet so the acid does not condense at the pump.

4. Central or per laminator

A 500 MW/year line runs 10–16 laminators (or 4–6 multi-stage machines), each with a pump-down every 5–20 minutes. Per-laminator pumps are the builders' default and keep each machine independent. A central vacuum system — a header at 1 mbar fed by a bank of dry screw pumps with a booster, a receiver, a valve per laminator — is used in the largest plants: pump-downs are staggered by the line control, diversity is 0.4–0.6, the pumps are out of the hall (which is hot and smells of acetic acid), and the VOC exhaust is one duct to one abatement unit. Against: a 1 mbar header over 100 m of pipe needs a large bore (DN150+) to keep its conductance, and a header fault stops every laminator — duplex booster/screw sets are mandatory. The energy case follows the general argument in Energy: VSD, central versus point-of-use.

5. Other vacuum on a module line

  • Cell handling: stringers and layup robots pick 182–210 mm cells (170 µm thick, fragile) with Bernoulli grippers or soft suction cups at −100 to −300 mbar, high flow — side channel blowers (1SC429) with fine filters, since cell edge chips are the defect.
  • Glass handling: vacuum lifters for 2.3 × 1.2 m glass — the glass note §1; DRV25 with reservoir.
  • Electroluminescence and leak test: EL test needs no vacuum; some lines test module edge-seal integrity in a vacuum chamber.
  • Thin-film and heterojunction cell lines (where present): PECVD and PVD at 10⁻³–10⁻¹ mbar with large dry screw and booster sets — the PVD coating note at factory scale.

6. Worked line: 500 MW, 12 single-stage laminators

Duty Volume Target Dr.Vakuum answer
Laminator pump-down (12) 1.5 m³ each 2 mbar in 4 min 12 × DV175 with cold traps and ballast, or 12 × DSI150 oil-free
Central alternative header at 1 mbar 6 pump-downs overlapping 2 × (MB600 + DSI300) duplex, 2 m³ receiver
Cell handling, 6 stringers — −200 mbar, 150 m³/h each 6 × 1SC429 + fine filters
Glass lifters (4) — −700 mbar, reservoir 4 × DRV25

Recommended Dr.Vakuum machines

Two-stage oil-sealed vane (DV Series) — laminator pumps that hold speed through the last decade: DV90, DV175, DV275, with cold traps and Viton seals.

Single-stage vane (V Series) — large chambers where 2–5 mbar is the target: V301, V630.

Dry screw (DSI Series) — oil-free laminator and central systems, acetic acid passed to an exhaust condenser: DSI150, DSI300.

Roots boosters (MB Series) — two-minute pump-downs and central headers: MB300, MB600.

Side channel blowers (1SC Series) — cell and glass handling: 1SC429.

Laminator to pump. Tell us the chamber volume, the target pressure and pump-down time, the encapsulant and the number of laminators, and we will size the pump and trap per machine or a central set — and show the oil-free option's cost and payback. Talk to an engineer.